Three phase supply with concealed wiring will be provided. The actual supply may be single or
three phases based on the TNEB rules and regulations at the time of energizing the complex.
Separate meter will be provided for each flat in the main board located outside
the flat at the place of the choice of the Party of the First Part.
Common meter will be provided for the common services in the main board.
Split AC provision will be provided in the master bedroom. Only pipe provision
will be provided in the other bedrooms.
15A plug points will be provided for Fridge and Washing machine at appropriate location.
All toilets will have 15A Geyser provision.
The wiring for 5A points will be of 1.0 sq.mm rating adequate for equipments of capacity of 500W and 15A points will be of 2.5 sq.mm rating adequate for equipments of 1500W. AC wiring will be of 4 sq.mm which can take up a capacity of 2 tonnes.